888-313-1303
www.trigonsports.com
14
STEP 12
COACHES PLATFORMS
1. Install pre-assembled coach’s platforms on each side of dolly assembly by inserting long rod
through back frame assembly and inside shaft of coach’s platform as shown in pictures above. Se-
cure with heavy duty cotter pins.
2. Be sure all bolts underneath platform are secure.
3. The coach’s platform can be lifted to an upright position for transport and storage by locking into
place with safety pin already attached to back frame assembly.
IMPORTANT: INSPECT BEFORE USE!
1. Once all components are assembled be sure to make a final check of all components.
2. Be sure all components are tight and installed properly.
3. Test lowering the cage and raising to be sure net does not prevent cage from lowering properly. (If
this happens check to make sure you did not secure net in wrong area)
4. Move cage using dolly assembly by pushing down on the handle to lift rear of cage. This will allow
easier steering when moving cage to desired location or storage.
5. Side wheels are able to turn sideways by changing position of locking pin and turning wheel to the
side. Be sure to reinstall locking pin once wheel is in spot needed. This will allow for easier storage in
tight spaces.
THANK YOU FOR PURCHASING THE TRIGON SPORTS ProCage™ ROLLAWAY BATTING CAGE.
FOR OTHER GREAT BASEBALL/ SOFTBALL PRODUCTS VISIT US ON THE WEB
WWW.TRIGONSPORTS.COM
OR CONTACT A LOCAL TEAM DEALER!