123793 - GB
G - Stage 17:
Drill the 11 planks (#6) as per the diagram in stage 17.
Then install the planks starting by the top and placing plank #6 against the already in place plank
#2.
Here is a suggestion for the positioning of the climbing holds.
To install them, drill the plank with the Ø12 drill bit at the desired points, push in the threaded insert
(#26) by hitting it with a mallet and attach the climbing hold #24 as per the attached diagram.
H - Stage 18:
Then drill floor #25 as per the stage diagram.
Install the slide on the floor with the recommended screws.
I - Stage 19:
To assemble and fix the gantry part with the Tower. To put the various tackles on the beam
at the dimensions given page 5.
K - Stage 20:
Cement the portal frame using the real measurements, between the posts, once assembled.
22 Notice N°123 793 Rev B
Summary of Contents for Play Station 28970
Page 10: ...121 512 121 603 121 112 121 603 121 603 121 134 150 774 77 121 512 4 10 Notice N 123 793 Rev B...
Page 13: ...23 54 44 35 35 27 1 E 13 Notice N 123 793 Rev B...
Page 16: ...121 509 121 617 121 617 G 16 Notice N 123 793 Rev B...
Page 35: ...10 11 12 17 8 25 2 41 2 1635 17 2 2 14 695 7 46 14 27 35 36 39 41 25 35 Notice N 123 793 Rev B...
Page 36: ...4 73 10 11 13 14 3 6 75 67 3 3 2 7 570 320 1565 1 10 40 3 3 3 18 2 36 Notice N 123 793 Rev B...
Page 39: ...50 46 22 27 35 35 27 375 5 6 182 18 7 18a 18b 39 Notice N 123 793 Rev B...