www.tridonic.com
8
Subject to change without notice. Information provided without guarantee.
Data sheet 04/22-EM115-12
Emergency lighting units
EM LED Light Engines
6. Functions
6.2 Testing
Commissioning test
A full commissioning test is carried out automatically after permanent con-
nection of the supply for 5 days. The easy commissioning feature will set the
initial test day and time to ensure random testing of units.
Functional test
Functional tests are carried out for 5 seconds on a weekly basis under the
control of the Micro controller. Initiation and timing of these tests is set dur-
ing the commissioning of the luminaire.
Duration test
A full duration test is carried out yearly to check the capacity of the batteries.
For a full description of commissioning and test features please refer to
application notes.
Test switch
Test switch is integrated in the bezel. This can be used to to:
• Initiate a 5 seconds function test:
press 200 ms < T < 1 s
• Execute function test as long as switch pressed: press > 1 s
• Reset selftest timer (adjust local timing):
press > 10 s
To initiate a test use a suitable tool, refer to drawing below.
Note: Press test switch carefully to avoid damaging it.
Timer reset functionality
The timer for function and duration test can be set to a particular time of the
day by either pressing the test switch for longer than 10 seconds or cycling
the unswitched line supply 5 times within 1 minute. The timer adjustment
will enable the test start time to be defined manually at time in day when the
timer was reset. It will also disable the adaptive test algorithm thereby forc-
ing the unit to perform the test at the same time rather than it being defined
by the adaptive algorithm. This function will only work provided the interval
time is greater than zero (automatic test mode enabled). The delay timer
6.1 Status indication
System status is indicated by a bi-colour LED. The indication LED is integra-
ted in the bezel.
LED indiction
Status
Comment
Permanent green
System OK
AC mode
Fast flashing green
(0,1 sec on – 0,1 sec off)
Function test
underway
Slow flashing green
(1 sec on – 1 sec off)
Duration test
underway
Red LED on
Load failure
Open circuit / Short circuit / LED failure
Slow flashing red
(1 sec on – 1 sec off)
Battery failure
Battery failed the duration test or function
test / Battery is defect or deep discharged /
Incorrect battery voltage / Battery is outside of
its temperature range for charging (0 – 60 °C)
Fast flashing red
(0,1 sec on – 0,1 sec off)
Charging failure Incorrect charging current
Double pulsing green
Inhibit mode
Switching into inhibit mode via controller
Green and red off
DC mode
Battery operation (emergency mode)
value set when the unit was commissioned will be reloaded in order to ran-
domise the tests between adjacent units.
Rest mode
Rest mode can be initiated by applying a short pulse of between 9.5 V
DC
and
22.5 V
DC
in amplitude for a period of between 150 ms and 1.0 s. This should
be applied to terminals marked Rest after the mains supply has been discon-
nected and whilst the module is in emergency operation. Terminals are not
sensitive to polarity.
After a mains reset the EM R2A ST exits the rest mode. The EM R2A ST sup-
ports the re-light function.
Pulse/Mode
Standby
Emergency
Rest
150 – 1,000 ms
Inhibit
Rest
–
1,001 – 2,000 ms
Cancel inhibit
–
re-light
6.3 Technical data batteries
Accu Lithium Iron Phosphate
International designation
IFpR 19/66
Battery voltage/cell
3.2 V
Single cell dimensions
Diameter
18 mm
Height
65 mm
Capacity two cell pack
3.0 Ah
Max. short term temperature (reduced lifetime)
70 °C
Max. number discharge cycles
50 cycles total
Packing quantity
1 pc. per carton
Comply with UN 38.3 and IEC 62133 (safety testing) protected against over
charge, over discharge, charging at excessive temperatures, short-circuit and
over current.
For battery data see separate data sheet.
1.5 mm
Test Switch
Status LED