STEP 3
:
Rotate the handlebars to to the vertical position and use 5mm allen wrench to
tighten. On some Spikes and all Titans there are also Horizontal Bars on top of the vertical
handlebars. Rotate those around to a comfortable hand position and tigthen using a 5 mm
Allen Wrench.
STEP 4
: Loosen the 2 bolts holding the boom with a 6mm Allen Wrench .Pull the boom
out about 8 inches. Make sure the derailleur post is perpendicular to the ground and the
retighten. You will do a final chain length and boom adjustment at the end of assembly.