TriangleTube Prestige Trimax 175 Installation Instructions Manual Download Page 5

5

PRESTIGE IGNITION KIT - INSTALLATION INSTRUCTIONS

1.5.7  Control Module Replacement

1.  Remove the 2 screws securing the Control Module into 

the enclosure and remove the Control Module. Retain 
screws for new Control Module installation. See 

Fig. 4.

2.  Discard Control Module according to applicable lo-

cal regulations.

3.  Install new TriMax control module with 2 retained 

screws.

4.  Reinstall the rear cover of the control module.

1.5.8  Wiring Connection (See 

Fig. 12)

1.  Reconnect all disconnected plugs to blower, gas 

valve  and sensors, as required. 

2.  Reconnect light green grounding cable (disconnect-

ed from old igniter) to the gas valve grounding tab.

3.  Connect new brown cable to ignition transformer and 

to control module grounding tab F01. See 

Fig. 12.

4.  Connect new violet wire to igniter grounding tab 

and to control module grounding tab F00.

5.  Reconnect all disconnected Molex wiring connec-

tors to the Control module, except X02. 

6.  Connect spark generator wiring to the control 

module

 

and to unconnected Molex connector.

7.  Connect new green grounding wire to one of the 

left grounding tabs on the casing.

8.  Connect green grounding cable that used to be 

connected to F00 to the grounding tab on the new 
violet cable connection.

1.5.9  Checking the Combustion Settings

1.  Turn boiler on.
2.  Allow the appliance to stabilize and insert the gas an-

alyzer probe in the top vent adapter measuring port.

3.  Check combustion values as follows (please refer-

ence the Installation Manual of the appliance for 

more details on the controls):

•  Press the round INSTALLER button.
•  Enter the installer access code “054” by using 

the LEFT and RIGHT buttons to select a digit 

and the UP and DOWN buttons to change the 

digit. Press the OK button to confirm.

•  Using the RIGHT button, highlight the Manual 

Operation icon,  then press the OK button.

•  Press the OK button while the FAN icon is high-

lighted to manually fire the burner and power 

the CH circulator.

•  Press the RIGHT button to adjust the firing rate 

from 1% to 100%.

1x

ENTER ACCESS CODE

05[4]

Manual Operation

Manual Operation

FAN

CH1

CH2

DHW

Released

Off

Off

Off

Fig. 8 - Accessing the Combustion Adjustment Interface

•  If the CO2 level during high fire (100%) differs 

by more than 0.4% from the recommended 
combustion setting  (See 

Table 3

) adjust the 

throttle screw (see 

Fig. 10

) as follows: 

•  Counter-clockwise rotation of the throttle 

screw at High Fire : O2 decreases, CO2 increases

•  Clockwise rotation of the throttle screw at 

High Fire : O2 increases, CO2 decreases.

•  Once the combustion level is set at high fire 

(100%), manually place the boiler into low fire 

(1%) mode by pressing the LEFT button to 

adjust firing rate down.

Summary of Contents for Prestige Trimax 175

Page 1: ...x 20 Flue gas analyzer 1 4 2 Preparation Procedure 1 Turn the boiler off by pressing the on off power switch 2 Allow boiler to cool down 3 Disconnect electrical power at the external electric box Avoi...

Page 2: ...W Bk V Fig 3 Prestige Solo Excellence Ignition Kit Item Description Qty 1 Igniter 1 Screws igniter 2 Gasket igniter 1 Bracket spark generator not illustrated 1 2 Spark generator 1 3 Wiring spark gene...

Page 3: ...r intake 3 from venturi Retain for reinstallation Before disconnecting any wire connections mark and label all connections and location of the connections 2 Open top access panels by removing top acce...

Page 4: ...Required 0 221 5 6mm Table 2 Orifice Sizes 1 5 4 Removing the Burner and Insulation 1 Remove heat exchanger bracket located at the back of the heat exchanger Discard bracket 2 Remove burner plate nut...

Page 5: ...nnection 1 5 9 Checking the Combustion Settings 1 Turn boiler on 2 Allow the appliance to stabilize and insert the gas an alyzer probe in the top vent adapter measuring port 3 Check combustion values...

Page 6: ...s 1 5 10 Return to Service 1 Reinstall the air intake on the venturi 2 Close top access panel as required 3 Check that all wiring connections are secure 4 Check that the gas connection is tight 5 Supp...

Page 7: ...llence PCB Wiring POSTMOD Gr Br W Bk V F00 F01 V To left side casing grounding tabs Connect to uncon nected Molex connector in exist ing boiler wiring DO NOT reconnect original boiler wiring Molex con...

Page 8: ...68 F 20 C 188 F 87 C CH1 Minimum Setpoint 120 F 49 C 60 F 15 C 188 F 87 C Reset Curve Coldest Day 0 F 18 C 30 F 34 C 50 F 10 C Reset Curve Warmest Day 64 F 18 C 60 F 15 C 78 F 25 C CH2 Circuit Enable...

Reviews: