5
PRESTIGE SOLO & EXCELLENCE IGNITION KIT - INSTALLATION INSTRUCTIONS
1
2
Fig. 9 - Prestige Solo & Excellence - Removal of old PCB
4
5
6
1
2
3
X15
X11
6
7
8
9
10
1
2
3
4
5
3
4
1
2
X16
8
9
10
11
12
1
2
3
4
5
13
6
14
7
X2
6
7
8
9
10
1
2
3
4
5
X3
7
8
9
10
11
1
2
3
4
5
12
6
X1
X12
X9
P14
1
2
X10
1
2
3
4
1
2
3
4
5
6
P13
1
2
3
1
2
3
4
5
6
F00
X18
5AT Fuse
5AT Fuse
5AT Fuse
1
2
3
1
2
1
2
3
4
1
2
3
4
5
6
X7
X4
X6
X5
CLICK
NEW
Fig. 10 - Prestige Solo & Excellence - Installation of new PCB
5. Reconnect all wire terminals to the new circuit
board terminals, except P14, 1&2 (See
Fig. 13
).
6. Route the wiring over the top of the control box.
7. Connect the spark generator power supply con-
nector to the free receptacle of the P14 terminal
(pins 1&2) of the PCB (See
Fig. 14)
.
8. Connect the violet ground wire to the ground con-
nection on the PCB, and on the ground lug located
on the igniter bracket (See
Fig. 14
).
9. Connect the green ground wire from the spark
generator to the ground tab located at the bottom
right hand side of the chassis (See
Fig. 14)
.
10. Protect the bare pins of former P14 connector using
2 Fast-on connectors.
11. Route the wiring (unconnected former P14 con-
nector included) in the plastic retaining clip located
at the rear of the control box.
12. Install the new control box front cover (See
Fig. 11)
.
13. Connect the brown ionization cable at the front of
the control box (See
Fig. 11)
.
14. Reuse the Control Board box to ship the old control
board to Triangle Tube and using the preprinted
shipping label.
2
1
NE
W
New connection
location
Fig. 11 - Prestige Solo & Excellence - Installation of new Front Cover
1.5.4 Follow-up Tasks
1. Perform any required configuration change in the wir-
ing and CTRLMax setup according to
Paragraph 1.6
.
2. Reinstall the boiler front panel.
3. On the rating plate of the appliance, cover the “PA”
of the Serial Number with the “PB” sticker provid-
ed with the kit. This will indicate that the boiler has
been upgraded with the ignition kit, for future ref-
erence. See
Fig. 12.
Fig. 12 - Prestige Solo & Excellence - Rating Plate Correction
PB
Stick here
1.5.5 Testing
1. Start up the boiler, refer to the Installation Manual of
your appliance for the correct procedure and settings.
2. Should hard ignition still occur
, please check the
condition of the combustion chamber 2-in-1 insu-
lation. Refer to the Installation Manual of your ap-
pliance for the correct removal procedure. (See
Fig.
15
and refer to following step).
3. Replace the combustion chamber 2-in-1 insulation if:
• There are released stitches around the igniter
location hole (See
Fig. 15, Detail B)
.
• The insulation cloth shows frayed areas around
the igniter location hole (See
Fig. 15Detail A)
Refer to the installation manual of your appliance
for part reference and installation procedure.