background image

5

PRESTIGE SOLO & EXCELLENCE IGNITION KIT - INSTALLATION INSTRUCTIONS

1

2

Fig. 9 - Prestige Solo & Excellence - Removal of old PCB

4
5
6

1
2
3

X15

X11

6
7
8
9

10

1
2
3
4
5

3

4

1

2

X16

8
9

10
11
12

1
2
3
4
5

13

6

14

7

X2

6
7
8
9

10

1
2
3
4
5

X3

7
8
9

10
11

1
2
3
4
5

12

6

X1

X12

X9

P14

1

2

X10

1

2

3

4

1

2

3

4

5

6

P13

1

2

3

1

2

3

4

5

6

F00

X18

5AT Fuse

5AT Fuse

5AT Fuse

1

2

3

1

2

1

2

3

4

1

2

3

4

5

6

X7

X4

X6

X5

CLICK

NEW

Fig. 10 - Prestige Solo & Excellence - Installation of new PCB

5.  Reconnect all wire terminals to the new circuit 

board terminals, except P14, 1&2 (See 

Fig. 13

).

6.  Route the wiring over the top of the control box. 
7.  Connect the spark generator power supply con-

nector to the free receptacle of the P14 terminal 
(pins 1&2) of the PCB (See 

Fig. 14)

8.  Connect the violet ground wire to the ground con-

nection on the PCB, and on the ground lug located 
on the igniter bracket (See 

Fig. 14

). 

9.  Connect the green ground wire from the spark 

generator to the ground tab located at the bottom 
right hand side of the chassis (See 

Fig. 14)

10.  Protect the bare pins of former P14 connector using 

2 Fast-on connectors.

11.  Route the wiring  (unconnected former P14 con-

nector included) in the plastic retaining clip located 

at the rear of the control box. 

12.  Install the new control box front cover (See 

Fig. 11)

.

13.  Connect the brown ionization cable at the front of 

the control box (See 

Fig. 11)

.

14.  Reuse the Control Board box to ship the old control 

board to Triangle Tube and using the preprinted 

shipping label.

2

1

NE

W

New connection 

location

Fig. 11 - Prestige Solo & Excellence - Installation of new Front Cover

1.5.4   Follow-up Tasks

1.  Perform any required configuration change in the wir-

ing and CTRLMax setup  according to 

Paragraph 1.6

.

2.  Reinstall the boiler front panel.
3.  On the rating plate of the appliance, cover the “PA” 

of the Serial Number with the “PB” sticker provid-

ed with the kit. This will indicate that the boiler has 

been upgraded with the ignition kit, for future ref-
erence. See 

Fig. 12.

Fig. 12 - Prestige Solo & Excellence - Rating Plate Correction

PB

Stick here

1.5.5   Testing

1.  Start up the boiler, refer to the Installation Manual of 

your appliance for the correct procedure and settings.

2.  Should hard ignition still occur

, please check the 

condition of the combustion chamber 2-in-1 insu-
lation. Refer to the Installation Manual  of your ap-
pliance for the correct removal procedure. (See 

Fig. 

15 

and refer to following step).

3.  Replace the combustion chamber 2-in-1 insulation if:

•  There are released stitches around the igniter 

location hole (See 

Fig. 15, Detail B)

•  The insulation cloth shows frayed areas around 

the igniter location hole (See 

Fig. 15Detail A)

Refer to the installation manual of your appliance 

for part reference and installation procedure.

Summary of Contents for Prestige PA 299 V1

Page 1: ...ds 1 1 V1 and V2 PA299 and PA399 Boilers There are two different blower venturi arrangements that result in two different required ignition kits The separate blower and venturi V2 configuration ap pli...

Page 2: ...ed 2 6 PB Sticker S N adaptation not shown 1 7 Combustion Chamber Insulation gasket not shown 1 Fig 1 Prestige Solo Excellence Ignition Kit Gr Br W Bk V 4 5 6 1 2 3 X15 X11 6 7 8 9 10 1 2 3 4 5 3 4 1...

Page 3: ...ing the power switch 5 Disconnect electrical power at the external electric box Avoid electrical shock by disconnecting the electrical supply prior to performing any operation on the internal parts of...

Page 4: ...spark generator with bracket B on the blower clamp A aligning bracket hole with blow er clamp hole See Fig 6 6 Reinstall the blower clamp screw A to secure the spark generator bracket to the blower cl...

Page 5: ...x front cover See Fig 11 13 Connect the brown ionization cable at the front of the control box See Fig 11 14 Reuse the Control Board box to ship the old control board to Triangle Tube and using the pr...

Page 6: ...Excellence PCB Wiring Pre modification Protect bare pins with Fast on connectors then store connector and wiring at the rear of control box with retaining clips 4 5 6 1 2 3 X15 X11 6 7 8 9 10 1 2 3 4...

Page 7: ...7 PRESTIGE SOLO EXCELLENCE IGNITION KIT INSTALLATION INSTRUCTIONS A B Fig 15 Prestige Solo Excellence Combustion chamber 2 in 1 Insulation Damages...

Page 8: ...21 5 22 6 23 8 25 10 11 24 ALARM Pump 3 Flex Relay 3 to be set to MIX OPEN MIX OPEN ON ONLY if no additional pump is con nected to Flex Relay 3 P3 If a pump is connected please con tact your TTP assi...

Page 9: ...Off DHW ECS SWW Off MIX OPEN Off MIX CLOSE Off ERROR On FLAME Off Save Exit Boiler Settings Boiler Settings Prestige Model Solo Lockout Temp 105 C Modbus Address 1 Pump settings Pump Settings Current...

Reviews: