background image

8.    Open the manual gas shut off valve.  Before placing

the  CHALLENGER  back  into  operation  check  and
test  all  gas  connections  for  leaks.    Repair  leaks  if
found.

Do not check for gas leaks with an open flame.  Use a bub-
ble test.  Failure to check for gas leaks can cause severe
personal injury, death or substantial property damage.

Inspect Ignition Electrode

Inspection of the ignition electrode is not required on a
brand new previously unfired CHALLENGER unless after
completing  the  gas  conversion,  ignition  issues  are  pre-
sent. Verify smooth ignition performance after complet-
ing the gas conversion to determine if the electrode may
require inspection.

Prior to inspecting the ignition electrode, ensure all electri-
cal power supply to the appliance is turned off to avoid elec-
trical shock.

1.    Remove  the  ignition  electrode  using  the  T-15  Torx

wrench.

2.    Remove any white oxides accumulated on the elec-

trode using fine grit sandpaper or steel wool. If the
electrode does not clean to a satisfactory condition,
replace the ignitor.

3.    Check igniter to Fig. 2

4.    When  replacing  the  ignition  electrode,  ensure  the

gasket is in good condition and correctly positioned,
replace gasket if necessary.

Check Inlet Gas Supply Pressure

1.    Turn  on  the  electrical  power  supply  to  the  CHAL-

LENGER.

2.    Check  the  inlet  gas  supply  pressure  to  the  CHAL-

LENGER at the gas valve see Figs. 3 & 4. Ensure a
minimum pressure of 5” w.c [13 mbar] during flow con-
ditions  with  all  gas  appliances  firing  including  the
CHALLENGER  and  a  maximum  pressure  of  13”  w.c
[32 mbar] during non-flow conditions with all gas appli-
ances off including the CHALLENGER.

Combustion Test and Adjustments

1.    The  installer  must  perform  a  complete  combustion

check to ensure the following combustion levels are
met at high and low input firing rates and the burner
is operating at optimum conditions for propane gas.

The combustion testing and adjustments must be performed
only by a qualified installer, service agency or the gas suppli-
er.  All combustion measurements must be performed with
calibrated equipment to ensure proper readings and accura-
cy.

WARNING

NOTICE

WARNING

WARNING

CHALLENGER

Natural Gas to Propane Instructions

3

 

Sp

ark

 ga

p a

pp

rox

im

ate

ly. 0

.18

” 

1.06” -1.12” 

0.12” [    3 mm]

0.

12

” [

m

m

]

0.43” [11 mm]

 [27 mm - 29 mm]

 [5

 m

m

]

1.

75

” [

44

 m

m

]

1.

18

” [

30

 m

m

]

(45

º)

Fig. 2:  Igniter Dimensions

Reviews: