![Trianco AZTEC 12 Installation, Operation And Servicing Instructions Download Page 21](http://html1.mh-extra.com/html/trianco/aztec-12/aztec-12_installation-operation-and-servicing-instructions_1159892021.webp)
21
25
NO GREEN LIGHT
IS THERE POWER TO THE
BOARD?
HAS THE FUSE
BLOWN ON THE
PCB?
HAS THE RCD
TRIPPED?
IS THERE
POWER TO LIVE
AND NEUTRAL?
YES
NO
CHANGE FUSE
AND CHECK
PUMP
YES
NO
CHANGE PCB
CHECK SYSTEM
WIRING
RESET RCD
YES
NO
FLASHING RED LIGHT
ARE CABLES
AND
CONNECTIONS
OK
NO
IS THERE
POWER TO ALL
ELEMENTS
YES
CHANGE PCB
NO
IS THERE
CONTINUITY
ACROSS THE
ELEMENTS
YES
REPLACE
CABLES
REPLACE ELEMENT
OR HEAT EXCHANGER
NO
CHANGE PCB
YES