Page 13
I
NTRODUCTION
Initial and periodic crimp verifications must be made in order to be certain a given TAC
is crimping properly. Once a TAC is set-up and crimp verification accomplished, the
device will normally complete hundreds of thousands of acceptable crimps before
indenter adjustment or replacement is necessary.
However, as in all precision equipment, something can malfunction, or the indenters
may inadvertently be subjected to a hard substance and the resulting crimp not meet
acceptable parameters. Therefore, it is recommended that the Crimp Verification
procedure be performed at least monthly. A system of "spot checks" can also be
established to verify acceptable crimps.
The Initial Crimp Verification should be performed immediately after the TAC has been
set-up (Section 2). Although the procedure is the same as all other verification tests, it
affords the user an opportunity to record data before the machine has been used
extensively. Read and understand Section 4, Operating Procedures, before performing
the verification. This paragraph details the procedure to verify TAC's with a fixed "G"
dimension and with an operator-selectable "G" dimension.
Perform the following steps to verify acceptable crimps:
W
ARNING
:
Before the funnel cover plate or the cylinder arbor cover plate is removed,
DISCONNECT the air supply from the sleeve valve. INJURY COULD RESULT ! !
Step 1.
Open the sleeve valve.
Step 2.
Disconnect the air supply from the sleeve valve.
Step 3.
Refer to Figure 3-1.
Step 4.
Remove the four button head socket cap screws securing the crimp
cylinder arbor cover plate.
C
RIMP
VERIFICATION
I
NITIAL
CRIMP
VERIFICATION
Arbor Plate
Removed
Figure 3-1: Crimp Cylinder Arbor, Open
Section 3
Summary of Contents for TAC-10X
Page 5: ...Page 5 Figure 1 1 TAC 10X Front View ...
Page 7: ...Page 7 Figure 1 2 Wire Insertion Through Funnel ...
Page 10: ...Page 10 Figure 2 1 Pneumatic Hook Ups Air Off Air On ...
Page 16: ...Page 16 Crimp Inspection Points Improper Crimps Figure 3 3 Crimped Samples ...
Page 24: ...Page 24 Figure 6 1 TAC 10X Pneumatic Control Panel ...
Page 25: ...Page 25 Figure 6 2 TAC 10X Components Right View ...
Page 26: ...Page 26 PLC Controller Switching Power Supply Figure 6 3 TAC 10X Components Left View ...
Page 30: ...Page 30 ...
Page 31: ...Page 31 Carefully Remove Hose Clamp ...
Page 34: ...Page 34 ...
Page 38: ...Page 38 Figure 7 3 TAC 10X Pneumatic Diagram ...