Page 9
I
NTRODUCTION
Although all TAC's are ruggedly constructed, adequate precautions must be observed
and all instructions followed to prevent damage to the device during the Initial Set-up
Lift and transport the TAC using only the baseplate Do not lift, pull shove or jostle the
feeder bowl, the crimp cylinder or any component mounted on the baseplate.
Damage will result!!
Read this entire section before proceeding. The time required to have this TAC ready
for CrimpVerification {Section 3) is less than one hour.
The shipping container in which the TAC is transported is a three piece design
constructed to ensure safe arrival of the device.
The bottom base piece of the container holds the TAC; the other pieces of the
shipping container consists of the top and four sides, which are secured to the bottom
base by mounting straps.
To Uncrate/Unpack the TAC:
Step 1.
Carefully cut all mounting straps surrounding the ship- ping container.
Step 2.
Carefully lift the top and sides of the container until all sides are clear of
the TAC.
Step 3.
Inspect for damage.
If damage due to shipping is observed, do not continue. Contact the factory and the
shipping carrier.
Step 4.
Carefully raise the TAC using only the baseplate for lifting,
then set the machine on a smooth level working surface
Step 5.
The shipping container may be discarded. However, if reshipment to
another location is possible, it is recommended that the container,
fasteners and packing material be retained.
INITIAL INSTALLATION AND SETUP
Perform the following to hook-up the pneumatic input:
Referring to Figure 2-1. Attach appropriate female connector to male connector
located at sleeve valve on right side of TAC. The air supply must be approx.
85 PSI
minimum - 125 PSI maximum
through a 3/8- in. hose or conduit. Air must be clean,
dry and oil-free.
The sleeve valve is used to turn the controller ON and OFF and all pneumatic valves
and sensors.
DO NOT CLOSE (Turn On) THE SLEEVE VALVE AT THIS TIME.
I
NITIAL
S
ET
-U
P
C
AUTION
!
U
N
-
CRATING
/
U
NPACKING
P
NEUMATIC
H
OOK
-
UP
Section 2
Summary of Contents for TAC-10X
Page 5: ...Page 5 Figure 1 1 TAC 10X Front View ...
Page 7: ...Page 7 Figure 1 2 Wire Insertion Through Funnel ...
Page 10: ...Page 10 Figure 2 1 Pneumatic Hook Ups Air Off Air On ...
Page 16: ...Page 16 Crimp Inspection Points Improper Crimps Figure 3 3 Crimped Samples ...
Page 24: ...Page 24 Figure 6 1 TAC 10X Pneumatic Control Panel ...
Page 25: ...Page 25 Figure 6 2 TAC 10X Components Right View ...
Page 26: ...Page 26 PLC Controller Switching Power Supply Figure 6 3 TAC 10X Components Left View ...
Page 30: ...Page 30 ...
Page 31: ...Page 31 Carefully Remove Hose Clamp ...
Page 34: ...Page 34 ...
Page 38: ...Page 38 Figure 7 3 TAC 10X Pneumatic Diagram ...