5
U
NPACKING AND
I
NSTALLATION
This chapter provides unpacking and setup information for the Switch.
Unpacking
Open the shipping cartons and carefully unpacks its contents. The
carton should contain the following items:
??
One the 16-Port 10/100Mbps NWay Ethernet Switch
??
One AC power cord; suitable for your area’s electrical
power connections
??
Four rubber feet to be used for shock cushioning
??
Screws and two mounting brackets
??
This User’s Guide
If any item is found missing or damaged, please contact your local
reseller for replacement.
Installation
The site where you install the Switch may greatly a ffect its
performance. When installing, consider the following pointers:
??
Install the Switch in a fairly cool and dry place. See
Technical
Specification
for the acceptable operating temperature and
humidity ranges.
??
Install the Switch in a site free from strong electromagnetic
source, vibration, dust, and direct sunlight.
??
Leave at least 10cm of space at the left and right hand side of the
Switch for ventilation.
Summary of Contents for TE100-S16R
Page 1: ...TE100 S16R 16 Port 10 100Mbps NWay Ethernet Switch User s Guide ...
Page 2: ......
Page 8: ......
Page 22: ......
Page 26: ......