background image

-

 6 

-

Wiring the Redundant Power Inputs

1

7

The Trend Micro EdgeIPS Pro has two sets of power inputs – power input1 and power input2.
The top and side views of the terminal block connector are shown below.

Step

1

.

Prepaing the power code and wire locks.

Step

2

.

Insert a positive / negative AC wire power code respectively.

Step

3

.

When the wire is properly seated, the wire lock will be forced shut around it. Check whether
the wire is properly fixed.

Wiring the Redundant Power Inputs

1

8

Connecting the Power

1

9

Connect the 100 to 240 AC power cord to the power socker, which is connected to the EdgeIPS
Pro device. If the power is supplied properly, the “Power” LED will glow steadily. The power
input location and pin definition are shown in the following diagram.

Grounding the Unit

1

10

Grounding and wire routing help limit the effects of noise due to electromagnetic interference
(EMI). Run the ground connection from the terminal block connector to the grounding surface
prior to connecting the power. Please note that this product is intended to be mounted on a
well-grounded mounting surface, such as a metal panel. The minimum cross-sectional area of
the conductor must be equal to the input wiring cable’s width/circumference.

Step

1

.

Step

2

.

-

 5 

-

Summary of Contents for EdgelIPS Pro-2096

Page 1: ...1 22 23 24 13 14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5 6 7 8 9 10 11 12 BP 1 2 3 4 PORT 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 13 14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5 6 7 8 9 1...

Page 2: ...n 53 or above Safari version 10 1 or above Google Chrome version 63 or above Laptop with Ethernet Port RJ 45 Type User Name admin Password txone Deployment Scenario and System Operation Mode 4 Deploym...

Page 3: ...stem is resetting itself to factory defaults Reboot System Restore Factory Default Settings Reset to factory default setting 1 6 The reset button for the EdgeIPS Pro 2096 is located on the front panel...

Page 4: ...096 when you take it out of the box If you need to reattach the Rail attachment plate to the EdgeIPS Pro 2096 make sure the stiff metal spring is oriented towards the top as shown in the following pic...

Page 5: ...5 Step4 Step5 Step6 Release safety lock before mounting Push the safety lock forward to secure Retainer is in fully open position Press trigger down to release the slides from locking 4...

Page 6: ...to 240 AC power cord to the power socker which is connected to the EdgeIPS Pro device If the power is supplied properly the Power LED will glow steadily The power input location and pin definition ar...

Page 7: ...o 192 168 127 100 After that connect the PC and EdgeIPS Pro 2096 using an Ethernet cable Open a web browser on your PC and type https 192 168 127 254 into the address bar A pop up window will open to...

Page 8: ...management IP address for EdgeIPS Pro Confiture GatewayAddress of the EdgeIPS Pro Gateway Configure DNS setting of the EdgeIPS Pro DNS Configure Network VLAN ID of the device Network VLAN ID Use the...

Page 9: ...hardware bypass enabled Turn on RED Port Pair hardware bypass disabled Right LED 1 Gbps LINK ACT on 1 Gbps link Port Pair hardware bypass normal Turn on Green No Light The EdgeIPS Pro appliance cannot...

Page 10: ...iewing messages during the boot sequence or for debugging system boot issues To connect the console cable remove the protective cover on the port Serial Console Port Cable Pinouts The initial configur...

Reviews: