-
6
-
Wiring the Redundant Power Inputs
1
7
The Trend Micro EdgeIPS Pro has two sets of power inputs – power input1 and power input2.
The top and side views of the terminal block connector are shown below.
Step
1
.
Prepaing the power code and wire locks.
Step
2
.
Insert a positive / negative AC wire power code respectively.
Step
3
.
When the wire is properly seated, the wire lock will be forced shut around it. Check whether
the wire is properly fixed.
Wiring the Redundant Power Inputs
1
8
Connecting the Power
1
9
Connect the 100 to 240 AC power cord to the power socker, which is connected to the EdgeIPS
Pro device. If the power is supplied properly, the “Power” LED will glow steadily. The power
input location and pin definition are shown in the following diagram.
Grounding the Unit
1
10
Grounding and wire routing help limit the effects of noise due to electromagnetic interference
(EMI). Run the ground connection from the terminal block connector to the grounding surface
prior to connecting the power. Please note that this product is intended to be mounted on a
well-grounded mounting surface, such as a metal panel. The minimum cross-sectional area of
the conductor must be equal to the input wiring cable’s width/circumference.
Step
1
.
Step
2
.
-
5
-