16
6. Reinstall TOUGH GUN I.C.E. components / neck assembly.
7. Tighten neck bolt to torque specification of 60 in.-lbs. (7 Nm).
8. Connect water lines with quick connect couplers.
9. Fasten water line bracket with bolt (bracket and bolt included with
TOUGH GUN I.C.E. assembly).
NOTE
: Ensure both bolts are tightened on the mounting clamp.
10. Reinstall front-end consumables.
Neck Bolt
Water Line Bracket
4-4 Changing the Liner
A. Changing QUICK LOAD™ Liner
NOTE:
Ensure power supply is off before proceeding.
1. Remove consumables (nozzle, contact tip and retaining
head) (see
Section 4-1 Changing Consumables
).
2. Remove existing QUICK LOAD Liner by pulling it out from
the neck.
3. Insert the new QUICK LOAD Liner through the neck using the
welding wire as a guide (short strokes will prevent kinking).
4. Once liner stops feeding, give it an extra push until it
bottoms out in the liner retainer in the power pin to ensure it
is inserted completely.
QUICK LOAD Liner
Summary of Contents for TOUGH GUN CA3 Series
Page 25: ...25 NOTES ...