![Travis Industries 864 TRV GS2 Installation Manual Download Page 43](http://html1.mh-extra.com/html/travis-industries/864-trv-gs2/864-trv-gs2_installation-manual_1154067043.webp)
Finalizing the Installation
(for qualified installers only)
43
Travis Industries
4121102
100-01301
Steps for Finalizing the Installation
1. Remove the glass (see page 45).
NOTE:
If using propane (LP) convert the appliance prior to installing the logs.
2. We recommend you purge the gas line at this time (with the glass removed). This allows gas to be detected
once it enters the firebox, ensuring gas does not build up.
3. Make sure the two accent light bulbs are in place.
NOTE
: .Take care to not touch the bulb with your fingers (use a cloth or paper towel).
4. Install the four AA batteries (included in the owner’s pack) into the battery holder (see the illustration below). The
AA batteries act as a power backup in case the household (AC) power goes out. Install the 9v battery (included
in the owner’s pack) into control panel light assembly (see the illustration below). The battery holder is held in
place with Velcro and may be removed for easier access.
5. Install the logs (see page 47).
6. Replace the glass.
7. Start the heater.
8. Leak test all gas joints.
AA Battery
AA Battery
Lift up and swing the lower
grill down to acces the area
below the firebox.
Swing the concealment
cover up and slide it back to
expose the controls.
AA
Battery
Holder
AA Battery Tray
AA Battery
AA Battery
Battery for Control
Panel Lights
9v
Battery