1-800-724-6306 • www.transtechsys.com
Soil Readings
From the
Control Menu
, press
Measure
to enter the
Soil Reading
screen. The name of the material to be tested and project are displayed
for verification in the bottom right corner. The temperature of the soil is
displayed on the left side of the screen, below that the GPS information is
displayed. The cloverleaf measurement pattern is displayed for your
convenience with the highlighted position being the current position to
measure.
Position the gauge on the soil in position 1 as it appears on the screen
and press
1
.
Do not touch the gauge while it is busy taking a
measurement.
When reading 1 is complete, the gauge will prompt you to
move to location 2. Move the gauge to position 2 and press
2
to continue.
Repeat these steps for the remaining three measurements.
12