background image

Features 

 

A.  Electrode banana Jacks. 
B.  Electrode toggle switch. Posi-

tion the switch to “Internal” to 

measure using the built-in par-
allel probes on the back of me-

ter.  Switch to “External” when 

using one or two of the external 
electrodes. 

C.  Readout LCD. Resistance is 

displayed in Ohms and is read 
as 10^X +

1/2 decade where “X” 

is the range illuminated on the 
checker. 

D.  Test Button.  Pres and hold un-

til the readout displays a meas-
urement.  

E.  Battery compartment. Remove 

cover to insert battery. 

F.  Parallel Electrodes. 

 

Parts Included 

One - Surface Resistance Meter 
Two - Travel Probes 
Two - Test Leads 
One - Metal Plate 
One - Alligator Clip 

 

Power Options 

The SRM330 is powered by a 9 volt battery.  Insert battery into 
compartment on the back of meter.

 

 

 

 

 

Summary of Contents for Ohm Metrics SRM330

Page 1: ...Instruction Manual Continuous Workstation Monitors Model SRM330 Ohm Metrics...

Page 2: ...Ohm MetricsTM 2 2 Operation Power Option 2 Set Up 2 Parallel Probe Resistivity Testing 3 Probe Resistivity Testing 4 Resistance Between Two Points RTT 4 Surface to Ground Resistance RTG 5 3 Specificat...

Page 3: ...s of pres sure necessary for some measurements Suitable for factory audits and test lab evaluations Features include 10v and 100v range voltage selection Two Press Test lightweight travel probes Built...

Page 4: ...splayed in Ohms and is read as 10 X 1 2 decade where X is the range illuminated on the checker D Test Button Pres and hold un til the readout displays a meas urement E Battery compartment Remove cover...

Page 5: ...est 1 Place the meter on the surface to be tested 2 Move the toggle switch to Internal 3 Press and hold the test button until measurement is displayed 4 If measurement is outside acceptable limits cle...

Page 6: ...ntended test surface and press down on the spring loaded probes Have a 2nd person press the test button and hold both the probes and the button until a the measurements are displayed The SRM330 can be...

Page 7: ...a ground point on the material surface and specific positions on the material being tested This procedure complies with the EOS ESD S4 1 standard 1 Meter set up with both test leads connected to the...

Page 8: ...Model SRM330 All new products are guaranteed to be free from defects in material and workmanship for a period of one 1 year from the date of shipment Liability is limited to servicing after evaluatin...

Reviews: