QFB73CE
ENGLISH
6
Installation (continued)
CAUTION:
To avoid risk of property damage, follow these instructions closely . Failure
to follow these instructions may result in property damage caused by leaks at these
connections .
Do not use thread seal tape or other sealants on these water line connections .
-
Ensure all fittings and end connections are
free of debris .
-
Loop supply lines (11) if they are too long.
-
Secure metal nuts (12) of the supply lines
(11) to corresponding supply valves. Tighten
the nuts (12) by hand until they are snug.
Then tighten the nuts (12) with a wrench.
11
12
13
Supply Line
(Red Markings)
Supply Line
(Blue Markings)
Cold Water
Supply Valve
Hot Water
Supply Valve
Fig . 3
POP-UP DRAIN INSTALLATION
-
Insert the pop-up drain body (1) into
the sink .
-
Ensure that the top gasket (2) rests
securely between the top of the sink and
the pop-up drain body (1).
Drain Body (1)
Top Gasket (2)
Sink
Fig . 4