VAV-SVN03A-EN
64
o
Confirm voltage present between 20 Vac and 28 Vac.
o
Ensure that the sensor is properly terminated.
o
If optional local heat is being used, confirm wiring per appropriate
diagram.
Communication Link Wiring
o
Field installed communications wiring complies with all applicable codes.
o
VariTrac Central Control Panel communication link wiring to VAV UCMs
and Voyager VAV rooftop unit is connected at TB2-10, TB2-11, and TB2-12
on the CCP.
o
Communication link wiring is properly terminated at each zone damper
UCM on terminals TB2-1 through TB2-6. Ensure that polarity (+ -) has
been maintained through the link.
o
Communication link wire shields spliced at each device junction and
taped to prevent contact with earth ground.
Completing Central Control Panel
Assembly
Mount Main Module
Refer to Mount Main Module instructions in this manual.
Install Operator Display
Refer to Install Operator Display instructions in this manual. The Operator
Display is required for the Delivered VAV system to function.
Connecting Modem Devices
Refer to Connecting Modem Devices instructions in this manual.
Installation Checklist