
18
UV-SVN002-EN
Installation Drawings
HUV Inlet Arrangements
DIGIT 20 = A
FA DUCT TOP
w/RA DUCT LOWER BACK
DIGIT 20 = B
FA DUCT TOP
w/RA DUCT BOTTOM
DIGIT 20 = G
FA DUCT UPPER BACK
w/RA DUCT BOTTOM
DIGIT 20 = F
FA DUCT UPPER BACK
w/RA DUCT LOWER BACK
DIGIT 20 = E
100% FA DUCT TOP
DIGIT 20 = K
100% FA DUCT UPPER BACK
DIGIT 20 = C & D
(
C
) FA DUCT TOP
w/RA BAR GRILLE BOTTOM
(
D
) FA DUCT TOP
w/RA OPEN BOTTOM
DIGIT 20 = H & J
(
H
) FA DUCT UPPER BACK
w/RA BAR GRILLE BOTTOM
(
J
) FA DUCT UPPER BACK
w/RA OPEN BOTTOM (no grille)
DIGIT 20 = M
100% RA DUCT BOTTOM
DIGIT 20 = L
100% RA DUCT LOWER BACK
DIGIT 20 = N & P
(
N
) 100% RA BAR GRILL BOTTOM
(
P
) 100% RA OPEN BOTTOM
(no grille)
Figure 15:
Supply/return air arrangements for the HUV
Summary of Contents for UV-SVN02B-EN
Page 38: ...38 UV SVN002 EN Wiring Diagrams Figure 44 Power Diagram For 480V 3 Phase 4 Wire Electric Heat...
Page 40: ...40 UV SVN002 EN Wiring Diagrams Figure 46 End Device Package 120V Hot Water DX Cooling...
Page 41: ...UV SVN002 EN 41 Wiring Diagrams Figure 47 208V or 240V 3 Phase 3 Wire Electric Heat DX Cooling...
Page 50: ...50 UV SVN002 EN Accessories Wall Boxes Figure 59 Vertical wallbox V1 V3 V2 V6 dimensions...