22
18-GJ06D2-2A
Table 10.
Downflow Installation
•
Downflow installation must comply with national, state, and local
codes.
•
The air handlers are rated for zero clearance from combustible
materials.
6.
Prepare the location site as appropriate for your application and
per national, state, and local code requirements.
7.
Set the unit in position.
Re p re s e n ta tive Illu s tra tio n
Typ ica l Do w n flo w In s ta lla tio n