34
OAU-SVX02F-EN
Pre-Start Check List
Task
Initial
Date
1. Voltage is present and landed at equipment.
2. Gas piping is complete and landed at each component. Inlet gas pressure
to be between 7 in. wg and 14 in. wg.
3. Field installed sensors installed. Refer to
“Factory-Provided Sensors,” p. 33
for list of sensors that may be required.
4. Control wiring installed and landed.
5. Accessories installed.
6. Ductwork installed (all runs in place, final tie in complete).
7. Drain lines installed and properly terminated.
8. Startup appointment with Horizon certified Trane service technician set and
confirmed.
Notes:
•
Check list must be completed and returned to Trane before startup is scheduled.
•
Startup must be performed by a Horizon-certified Trane technician with Tracer™ TU program.
•
Contractor to furnish access to equipment (ladder, lift, or roof access).