
28
T-Series Climate Changer Air Handler IOM •
CLCH-SVX06A-EN
Installation-Mechanical
Assembling the Unit
WARNING
Toxic Fumes!
Keep open flame away from unit exterior or interior. Do not weld or use cutting torch
on the exterior or interior of the unit. The unit contains polyurethane insulation.
Failure to keep open flame away from unit exterior or interior may result in the
production of toxic gas that could result in death or serious injury.
CAUTION
Temperature Limit!
The internal sections of this unit containing electrical components must not exceed
104
o
F operating temperature. Internal sections of the unit not containing electrical
components must not exceed 180
o
F temperature. Failure to comply with temperature
requirements may cause equipment damage.
Roof Assembly
Before sections are joined for final assembly, a butyl tape seal must be made at the roof
connection and then hardware and sealing metal strips are installed at the base
assembly, the roof joint or joints and both side panel seams. The butyl tape applied to
the roof panels will cover the drilled holes. See
Figure 10
and drawing
MS2998-3686-0100 in the hardware package.
Figure 10. Roof assembly (size 50 shown)
Cross
Joint strip
Butyl Tape
2 rows
Roof panels