![Trane BAYECON300 Series Installation Instructions Manual Download Page 8](http://html1.mh-extra.com/html/trane/bayecon300-series/bayecon300-series_installation-instructions-manual_1149330008.webp)
Installation
8
ACC-SVN155D-EN
Factory Installed Option
(Field Set Up)
WARNING
Hazardous Voltage with Capacitors!
Failure to disconnect power and discharge capacitors
before servicing could result in death or serious injury.
Disconnect all electric power, including remote
disconnects and discharge all motor start/run
capacitors before servicing. Follow proper lockout/
tagout procedures to ensure the power cannot be
inadvertently energized. Verify with a CAT III or IV
voltmeter rated per NFPA 70E that all capacitors have
discharged.
Each economizer ships inside the unit and requires partial
assembling and setup in the field.
Trane Configuration
1. Remove the filter/fan compartment access panel.
2. Remove the lower screws in the end panel. See
Figure 13
. Lay block-off angle aside for later
installation.
Figure 13.
Pull economizer assembly outward
3. Do not remove the screws in the upper row of the end
panel.
4. Grasp the bottom of the end panel and pull the
economizer assembly outward into the operating
position. See
Figure 13
.
5. Remove approximately 3" of gasket material from the
bottom of each corner post to expose the holes used to
attach the economizer assembly to the unit. See
Figure 14
.
6. With the screws provided, secure each side of the
economizer assembly by inserting a screw through the
clearance hole in the bottom of the corner post and into
the engagement hole in the economizer assembly.
Refer to
Figure 14
.
Figure 14.
Remove gasket material
7. Install the block-off angle underneath the economizer.
Refer to
Figure 15
. The block-off angle is designed to
close the opening created between the economizer
and the base when the economizer assembly is in its
operating position.
a. Holding the block-off angle with the holes at the
bottom and the bottom angle outward, tilt the top
forward and insert it into the opening between the
economizer and the unit base.
b. Press the bottom of the block-off angle against the
unit and line up the holes. Using the provided
screws, secure it into place.
Figure 15.
Block-off installation
Remove screws and lay blockoff
angle aside.
Blockoff Angle
Block-off
Screws
Seal along
these areas