![Trane BAYAHEMIKIT001A Service Manual Download Page 3](http://html1.mh-extra.com/html/trane/bayahemikit001a/bayahemikit001a_service-manual_1149543003.webp)
Page 3
5. Installing Ferrite Beads (Item 6) on a CTM motor.
Place
one ferrite bead on motor power wires. There should be
at least one loop made in the power wires, so the wires
pass through the ferrite bead twice. See Figures 6 and
7.
NOTE: The black tape wrap may need to be cut to have
enough wire to make the loops.
FIGURE 6
FIGURE 7
7. Disconnect the 3 pin connector between the blower
motor and the power supply. Pull the harness out of the
blower deck slot and back in front of the blower. See
Figures 8 and 9.
FIGURE 8
FIGURE 9
6. For units with a CTM motor, place a second ferrite bead
on the low voltage wires. There should be at least one
loop made in the low voltage wires, so the wires pass
through the ferrite bead twice. See Figure 7.
OR