18-GE12D1-8
5
Installer’s Guide
c.
Openings where field wiring enters the
cabinet must be completely sealed.
Loca-
tion of power entry is shown in the outline
drawing. Use 2.5" clear stickers provided to
seal all unused electrical knockouts. See
Figure 13.
d.
After ductwork connections are made, seal air-
tight and per Local codes.
DOWNFLOW BAFFLE KIT
X
X
7/8" GASKET
SCREWS TO
REMOVE COIL
SCREWS TO
REMOVE COIL
DISCARD
DRIP TRAY
1/2" GASKET
INSIDE SURFACE
OF BAFFLE
7/8" GASKET
SECT. X-X
(TYP. BOTH SIDES)
FILL WITH SEALANT
WATER
BLOW-OFF
BAFFLES
ATTACH WITH
2 SCREWS
EACH SIDE
WATER
DIVERTER
BAFFLES
(5-ton only)
Figure 9
Remove
and
Discard
Replace
with
Narrow
Baffle
For Maximum Efficiency on
Horizontal Left,
Upflow and Downflow
Figure 8