RLC-SVX03A-E4
3
Contents
Foreword
2
Warranty
2
Reception of unit
2
Cautions and warnings
2
Refrigerant
2
General information
Unit Inspection
5
Inspection Checklist
5
Loose Parts Inventory
6
Description of the Unit
6
General Data RTUB
7
General Data RTCA
8
Installation
Installation Responsibilities
9
Storage
9
Special Lifting and Moving Instructions
10
Isolation
10
Foundation
10
Clearances
11
Drainage
12
Releasing the Nitrogen Holding Charge
12
Water Connections (RTUB)
12
Flow Switch Installation
13
Water Pressure Gauges
13
Refrigeration Safety Valves
14
Water Pressure Relief Valves
14
Installing and Connecting Temperature Sensors
14
Connecting RTUB with the Remote Air-cooled Condenser
15