
10
7
12
Picture 12
Picture 10
STEP 6
Position the central unit (item 8) on the assembled structure as shown in picture 07.
STEP 7
Attach the central unit to the legs using M6x12 and M6x60 screws (items A and E)
without tightening the upper E screws and A screws, leaving a gap of 3.0 to 4.0 mm
to later attach the bases to the side board and the side burner as shown in picture
08.
STEP 8
Attach the side barriers (items 17 and 29) to the bases (items 12 and 30) using
M4x10 screws (item D). Then attach the side handles (item 14) together with the
guards (item 13) to the bases (items 12 and 30) using M6x12 (item A) screws as
shown in picture 09.
STEP 9
Attach the bases of the board and the side burner by fitting them in the A and E
screws that were left loose. Tighten them as shown in picture 10.
STEP 10
Attach the valve (item 34) together with the knob base (item 16) to the right side
barrier (item 17) using M4x10 screws (item D). After that, attach the side barriers
(items 17 and 29) to the central unit (item 8) using M4x10 screws (item D) as
shown in picture 11.
Picture 07
Picture 09
Picture 08
Leave a 3 to
4 mm gap
29
34
17
8
16
Picture 11A
Picture 11
The metal hose connected to
the valve (item 34) is flexible,
as shown in picture 11A.
STEP 11
Attach the side burner support (item 7) to the base (item 12) as shown in picture
12. Remove the cotter pin that is attached to the side burner (item 10). Fit the side
burner to the valve gas injector (item 34) and after that, re-attach the cotter pin,
fixating the burner to the support as shown in picture 13.
7