![TrafFix Scorpion II METRO TL-2 PLUS Assembly Manual And Mounting Instruction Manual Download Page 13](http://html1.mh-extra.com/html/traffix/scorpion-ii-metro-tl-2-plus/scorpion-ii-metro-tl-2-plus_assembly-manual-and-mounting-instruction-manual_1148301013.webp)
P/N 13089 Rev A1 Dated 5/13/2020 9
1.
IMPORTANT:
Before beginning Assembly, please read and review the Installation Section of this
manual, paying close attention to the checklist at the beginning of the section.
2.
Inspect the two pallets containing the Metro and Module A, shown in Figure 1, inspect for shipping
damage and completeness against the packing list. If there is anything missing or not complete,
contact a TrafFix Devices representative as soon as possible.
3.
WARNING: TOP HEAVY–
Indicates to move pallets with extreme caution. The use of a forklift is
preferred when handling pallets. All personnel should be kept clear when the pallets are being moved.
4.
Remove the shrink
-
wrap from the pallets using a utility knife.
Caution: Be careful not to cut any wires
or parts!
Figure 1
Metro TMA (TL
-
2) Assembly
Recommended* Assembly Tools
1.
Hammer
2.
Tapered Pry Bar
3.
Tape Measure
4.
12” Crescent Wrench
5.
1/2” Drive Socket Wrench
6.
1/2” Drive Socket (1
-
7/16”)
7.
Open End Wrenches (1
-
7/16”, 3/4”, 7/16”)
8.
3/8” Drive Socket Wrench
9.
3/8” Drive Socket (7/16”, 3/4”)
10.
Allen Wrench
11.
Wire Cutter/Crimper
12.
Floor Jacks or Stands (2 Ea.)
13.
Forklift
*More or less tools may be needed.
MODULE A
PALLETIZED
METRO
PALLETIZED
When Cutting Bands,
Pieces from Top will Fall
M01589
Summary of Contents for Scorpion II METRO TL-2 PLUS
Page 2: ...P N 13089 Rev A1 Dated 5 13 2020 i This Page is Intentionally Left Blank ...
Page 9: ...P N 13089 Rev A1 Dated 5 13 2020 5 Notes ...
Page 10: ...P N 13089 Rev A1 Dated 5 13 2020 6 Scorpion II Metro TL 2 Plus Major Components ...
Page 12: ...P N 13089 Rev A1 Dated 5 13 2020 8 Assembly of Scorpion II Metro TMA ...
Page 25: ...P N 13089 Rev A1 Dated 5 13 2020 21 Complete Assembly of Metro TMA Module E Module C Module A ...
Page 29: ...P N 13089 Rev A1 Dated 5 13 2020 25 GROUND LEVEL GROUND LEVEL ...
Page 45: ...P N 13089 Rev A1 Dated 5 13 2020 41 Scorpion II Metro TMA High Pivot ...
Page 46: ...P N 13089 Rev A1 Dated 5 13 2020 42 ...
Page 47: ...P N 13089 Rev A1 Dated 5 13 2020 43 ...
Page 48: ...P N 13089 Rev A1 Dated 5 13 2020 44 ...
Page 49: ...P N 13089 Rev A1 Dated 5 13 2020 45 Scorpion II Metro TMA Low Pivot ...
Page 50: ...P N 13089 Rev A1 Dated 5 13 2020 46 ...
Page 51: ...P N 13089 Rev A1 Dated 5 13 2020 47 ...
Page 52: ...P N 13089 Rev A1 Dated 5 13 2020 48 ...
Page 54: ...P N 13089 Rev A1 Dated 5 13 2020 50 Distributed By ...