background image

1

2

W200

Front Wall

410 x 2000

2

8

W200

Rear Wall

410 x 2000

3

32

P165

Roof Panel

410 x 1650

4

30

 W200

     410 x 2000 

5

8

9

10

4

U155

Rear  Wall Channel

11

16

 U155

Side Wall Channel   

1550

 12

8

U155

Roof Channel   

1550

 13   

4

G165

 Roof Channel   

1650

4

    U155

Front Wall Channel

1550

2

ML200

Left Door Frame

2000

2

MR200

Right Door Frame

 

1

Z224

Door Top  Frame 

2245

1

U224

2245

Door Bottom Frame

ITEM

QTY

PART #

NAME

SIZE (mm)

PARTS LIST

6

7

GS512-V1

S

TEP 

1     Check all parts against the component list

If you’re missing anything, just head to the Trade Tested website and get in touch.

Corner Anchor 

4

Hook Anchor 

12

Tek Screws

610

Wood Anchor Screws

15

Rivet

260

Corner Cover

4

Spacer

260

Rivet Gun

1

1

Tek Screwdriver Bit

1

2000

φ4.2 Drill Bit  

1

Screw Head Sheath 

150

Phillips Head Screws

26

 15   

 16   

 17   

 18  

 19   

 20   

 32

 33

 34

 35

 36

 37

1550

Side Wall

  

Please check your contents prior to starting assembly

Z119

E195 x 410 

E195 x 350 

U074
U195 

D193

H074

DOOR PART

QTY

PART #

5

3

2
6

3

2

SIZE (mm)

410 x 1950

350 x 1950

740

1950

1930

740

1110

ITEM

 47  

 48

 49
 51

 52

 53

 56

 57
 59

NAME

Door Panel

Door Panel

Door Channel
Door Channel

Door Square tube

Door Bar

Door Brace

2
6

Bolt(door outside)
Hinge

Bolt(door outside)
Hinge

 58

1

Bolt(door inside)

Bolt(door inside)

2

C190

Ridge Beam

2

 F153

Gables  

 

1530

2

B153

Gables

1530

2

U042

 Gables Bracket

420

2

    L030(L)

L Bracket LEFT

 

300 x 120

1900

 38

 39

 40

 41

 42

2

    L030(R)

L Bracket RIGHT

300 x 120

 43

Plastic Ridge End Cap 

2

Bolt and Nut

10

 44

 45

 14   

2

C115

Ridge Beam

1150

4

V155

Roof Tiles   

1550

 21  

 22  

 23

 24

4

C153

Ridge Beam

1530

Galvanized square tube

Galvanized square tube

2010

2250

4

1

X201

X225

 27  

 28
 30

Bracket

22

1

Z0745

Door Top  Frame 

745

1

U0745

745

Door Bottom Frame

Galvanized square tube

Galvanized square tube

1740

1760

6

6

X174

X176

 25 

 26

 46

Expansion screw(M10x80)

12

Flat fastener

 31

4

U112

4

1120

 50

Door Channel

H112

1120

 54

Door Bar

Z145

4

1450

 55

Door Brace

12

Z150

1500

Wall Bracing

 29  

Summary of Contents for GS512-V1

Page 1: ...INSTRUCTIONS AND ASSEMBLY INSTRUCTIONS GARDEN SHED OWNER S MANUAL overall size 3270 x 6110 x 2350mm shed size 3070 x 6110 x 2300mm door size 1 740 x 1950mm door size 2 1480 x 1950mm floor size 3030 x...

Page 2: ...into position Remember to leave plenty of room for the door to fully open An electric drill driver A Phillips screwdriver Gardening or work gloves Sealant or caulking gum optional Step ladder Tape mea...

Page 3: ...loor kits designed to match your shed Alternatively you can build your own using H4 treated bearers and timber floorboards Build on a compacted and levelled base layer Plastic sheeting placed under th...

Page 4: ...the panel until the screw is all the way in Make sure the block is not directly underneath the screw How to remove rivets if needed Don t worry if you have placed a rivet incorrectly or you need to ad...

Page 5: ...ASSEMBLY INSTRUCTIONS iii...

Page 6: ...r to starting assembly Z119 E195 x 410 E195 x 350 U074 U195 D193 H074 DOOR PART QTY PART 5 3 2 6 3 1 2 SIZE mm 410 x 1950 350 x 1950 740 1950 1930 740 1110 ITEM 47 48 49 51 52 53 56 57 59 NAME Door Pa...

Page 7: ...All panels should overlap by one corrugation i U155 x4 b Lay the wall panels out with the large rib overlapping the small Large Rib Small Rib Assemble the rear wall panels All pre drilled holes shoul...

Page 8: ...e left undone Tek Screw Screw from the outside in as per the pre drilled holes in the frame U channel joint Drill screw in joint STEP 3 a Assembling the side walls W200x30 U155x16 MR200x1 ML200x1 Join...

Page 9: ...varies squeeze together or stretch out the panels to make sure they line up Do not add screws to the top and bottom holes at each end of the panel These need to be left undone 4 U0745 Z0745 Leave the...

Page 10: ...ndone Leave the left and right door frames MR200 ML200 un fastened at this stage This will help with any adjustments needed later on Once the door positioning is finalised add the necessary screws Tek...

Page 11: ...rner brackets place a spirit level or block of wood underneath the corner of the shed This will ensure that the two walls being connected stay square as you drill the screws in OPTIONAL Once you have...

Page 12: ...30 R x2 STEP 6 a Assembling the ridge beam C190x2 C115x2 C153x4 When assembling the roof beam avoid placing screws too close to each end Some play is needed in order to slide the beam over each gable...

Page 13: ...sure it is square and flat to the slab Pre drill the Dia 8mm hole to a depth of 50mm x2 i Before and after the Support square tube of the wall just need two L Bracket piece to links i Support square...

Page 14: ...d Flat fasteners need very strong X174 X176 X225 X201 X201 X174 X176 And Need from exterior wall retaining screw to X201 X176 X176 X174 X174 X201 X201 Fit the Square tube using four 4 screws on either...

Page 15: ...holes on the roof channel G When attaching roof panels align them to the central roof beam NOT to the walls as these may shift during final fixing Screw the panels to the central beam first this leave...

Page 16: ...ts from outside please make 2 holes in middle of connection point and other equidistant holes for the rest of brace Take care to ensure that both ends of brace need insert into wall chanel when wall b...

Page 17: ...1 E195 x 410 x1 U195 x 4 U112x4 Rivet D193x2 Square tube In side of door Out side of door Rivet Rivet Out side of door E195 x 350 E195 x 410 D193 Square tube insert D193 square tube into U195 frame sc...

Page 18: ...move the hinge down until it is level with mark drill holes for your rivets and attach Use the drill bit to drill pilot holes through the door bracing into the door sheeting Flip the door back over t...

Page 19: ...5 x 350 x1 E195 x 410 x1 U195 x 2 U074x2 Rivet D193x1 Square tube In side of door Out side of door Rivet Rivet Out side of door E195 x 350 E195 x 410 D193 Square tube insert D193 square tube into U195...

Page 20: ...e the hinge down until it is level with mark drill holes for your rivets and attach Use the drill bit to drill pilot holes through the door bracing into the door sheeting Flip the door back over to th...

Page 21: ...15 rivets with washer galvanized handle door center strip door top strip door bottom strip door bar door inside door outside handle hasp hinges inside bolt for double door double door hasp on door...

Page 22: ...en first fitting doors attach the hinges to the shed using the Philips Head Screws This makes it easier to change the position later if required to get a good fit The screws can be changed for rivets...

Reviews: