Operators Manual - Pentruder Modular Drilling system
6
Equipment needed for drilling
The operator should have the following material at hand:
•
Hammer drill:
Used to drill holes to secure the base plate.
•
Hammer:
Securing anchors.
•
Anchors and bolts:
Mounting the base plate and removal of drilled cores.
•
Tools for mounting the drill stand and adjustments:
Tool set
•
Level:
To mount the column correctly at set up and control during drilling.
•
Measuring tape:
Positioning of base plate in relation to cored hole.
•
Extension adapter:
Used when drilling big diameter holes to increase the distance
between drill bit and spindle.
•
Hoses and electrical plugs:
When needed, extension hoses for the power pack and
hydraulic motor can be used.
•
Industrial vacuum cleaner:
Collection of concrete slurry and water retention.
•
Water collector ring:
To avoid spreading the water around the drill hole during drilling.
•
Equipment for safe removal of drilled cores:
Small cores can be removed by hand,
big diameter cores must be removed with a crane or other lifting equipment.
•
Helmet, eye- and earprotection, dust guards in dusty environments, protective
clothes, shoes and gloves.