TSP Quick Start Guide
3.2.2.1
Preparing the Unit
Rotate the two thumbscrews holding the tenon cover/camera door (on camera-
equipped models) counterclockwise to the release the tenon cover. These screws are
captive and will remain attached to the tenon.
The tenon cover is attached on one side of the tenon with sliding hinges. Pull the cover
straight out away from the tenon, then rotate to expose the mounting and electrical
connection points.
Remove the two large metal mounting straps
which are each secured in position by two 13
MM stainless steel bolts. These two straps
will be clamped down firmly on the tenon
pipe in final positioning steps.
Observe the stair step-like angle positioners
between the tenon pipe saddle and the
forward end of the housing. These are for
positioning the upward tilt of the TSP unit.
The farther the tenon pipe extends into the
Housing, the more upward tilt is available. For
most installations the LED panels are to be
near-horizontal and the fixture is positioned
on the first step.
Push the TSP unit onto the tenon pipe taking care not to tear the tenon pipe seal or
damage the AC mains leads. Position the fixture onto the desired stair step. Rotate the
fixture around the tenon pipe as needed for proper leveling and equally tighten all four
clamp bolts. Ensure that the AC mains cables are routed to not interfere with the
clamps. Tighten the four bolts to 100 to 150 in-Ibs (12-17 N-m).
DO NOT OVER TORQUE!
3.2.3
Wiring
For safety reasons, always connect the GROUND ("GND") lead FIRST before connecting
other AC mains leads.
Clamp the green ground “Bonding Wire” under the green screw “Bonding Terminal”, as
depicted below.
Connect the AC mains wires to the TSP power connector as shown below. No tools are
required. Strip the insulation back from the wires approx. ½”, press the appropriate
spring tensioned white lever, insert the wire as shown, and release the lever. Verify that
all wires are securely retained in the connector.
GND Wire from AC
Supply