4
English
lever handle
o-ring cap
Ceramic
Cartridge
handle adapter
setscrew
index cap
Cold supply
line
hot supply
line
Cold supply
line
hot supply
line
Cold supply
line
1-1/4”
(33mm)
1-3/4” (44mm)
diameter
Finish Wall
inSTaLLaTion proCedure
1.
valve body installation
Prior to fi nishing wall,
secure valve body onto
wall studs with hole straps�
(recommended height: 18-
1/4” above deck)
Connect hot and cold supply
line� Test valve and inspect
for leakage� put on protective
caps�
Finish wall with 1-3/4”
(44mm) diameter hole on
handle side and max 1-1/4”
(33mm) diameter hole on the
spout side� (Use template on
p.29)
2.
handle installation
remove protective caps
insert o-ring cap onto the handle adapter
insert lever handle, secure with small screw and apply index cap
DISCONTINUED
Summary of Contents for PO TL380SWL
Page 30: ...30 D I S C O N T I N U E D...
Page 31: ...31 D I S C O N T I N U E D...