background image

3

 WARNING

Always observe

Protect the product with a wiring circuit breaker (I

n 0.03A and 

25A differential switch, 20A magnetic thermal switch) and ground 

fault circuit interrupter (GFCI).

Install both switches outside of the bathroom.
Attach the tap water supply equipment to the bathtub.
Make sure to connect the ground wire (ground).

Use the specified AC voltage for the voltage.

 

●This may result in damage or failure to the device or a fire.

After completing the installation, make sure to check the 

operation of the wiring circuit breaker and ground fault circuit 

interrupter (GFCI).

 

●If the GFCI is not properly operating, it may result in a fire or electric 

shock.

Make sure to install the bathtub according to the installation 

guide and in a stable location that can withstand its mass.

 

Defective installation can result in an injury caused by the bathtub falling or 

flipping over.

Turn the wiring circuit breaker off during operation.

 

This may cause electric shock.

Ensure that you have an ergonomic working position during 

transport and assembly.

 

Take care at every stage that your move is safe. Ensure that you have 

assistance to avoid risk of accident or injury.

Observe the current local prevention of accidents and building 

regulations as well as sanitary and environmental protection 

rules during installation.

Use a fixed connection to supply power to the bathtub.

Do not extend or relay the power cord, connect it as 1 cord.
When installing the bathtub, do it within the protection area and 

make sure that the person does not touch any electrical devices 

from inside the bathtub.

Install the bathtub over 600 mm away from any electrical 

appliances or power sockets.

Stabilise the bathtub with a fixing plate.

 

The bathtub may shake if it is not properly stabilised.

Secure enough space between the bathtub and tiles, and fill that 

space with silicone that does not contain alcohol.
Check to see that the hole positions are not overlapping with the 

cavity portions of the tile base.

 

If there are cavities, use an adhesive anchor to stabilise.

Summary of Contents for PJYD2200PWEE

Page 1: ...er turned off when there is time until handing over the product in a new home Cautions and warnings 2 Included parts 5 Required tools 6 Specifications 7 Dimension drawings 8 Electrical construction 9...

Page 2: ...not apply any changes to them Especially make sure not to change the dimensions of the product Do not bend handle the power cords roughly or place heavy objects on them This could result in a fire or...

Page 3: ...g operation This may cause electric shock Ensure that you have an ergonomic working position during transport and assembly Take care at every stage that your move is safe Ensure that you have assistan...

Page 4: ...ning the packaging make sure that all of the supplied parts and the bathtub itself are not damaged and if they are do not use the damaged parts Replace any damaged parts When installing the bathtub in...

Page 5: ...A 4 A 5 A 6 A 7 A 8 X 1 X 2 Drain trap PP Flathead screwdriver small Bathtub Polyethylene foamed sheet Instruction manual Cleaning spatula for NECK BATH Bathtub fixing plate set Installation guide Ha...

Page 6: ...2 B 3 B 4 B 5 B 6 B 7 M12 M10 B 8 B 9 B 15 B 17 B 18 B 16 B 11 B 12 B 13 B 14 B 1 B 19 PVC primer 8 5 mm H05VVF 3 x 1 5 mm2 8 9 mm PVC adhesive Silicone Soft cloth that will not damage the bathtub Wat...

Page 7: ...g mode Approx 250L min Weak mode NECK BATH Circulation Number of intake parts 1 location Number of water outlets 1 location Water discharge flow rate Approx 18 L min HYDROHANDS Circulation Number of i...

Page 8: ...8 Dimension drawings In case of attaching an option floor standing bathtub filler For an optional water faucet ask the dealer contractor from whom you purchased the product or TOTO...

Page 9: ...A magnetic thermal switch and ground fault circuit interrupter GFCI Install both switches outside of the bathroom Use a fixed connection to supply power to the bathtub Do not extend or relay the power...

Page 10: ...10 Installation procedures 1 2 3 P 11 P 12 4 5 6 P 12 P 14 7 8 9 P 15 10 11 12 P 16...

Page 11: ...ed Indicates the work flow Building a base for the bathtub B 11 B 8 B 6 B 7 1 H 100 120 mm Waterproof Tile L 700 800 mm Please conduct site operation directly on the drain When embedding a power cable...

Page 12: ...12 Installing the bathtub 2 1 B 14 2 Lift up Lift up 3 B 18 B 17 B 2 Cardboard box etc for packaging the bathtub Other Choices 4 1 2...

Page 13: ...13 A 8 B 11 4 5 Power supply Brown Blue Green Yellow 3 B 2 IPX5 6 B 4 M12 5 1 5mm A 2 2 5mm...

Page 14: ...10 B 15 B 6 B 1 B 12 1 2 3 4 5 6 6 A 40mm A 40mm WARNING Check to see that the hole positions are not overlapping with the cavity portions of the tile base If there are cavities use an adhesive anchor...

Page 15: ...cessing The controller does not light up or operate any functions Is power being supplied Has there been a power outage Is it locked Unlock by pressing and holding for over 3 seconds HYDROHANDS NECK B...

Page 16: ...the bathtub with a fixing plate The bathtub may shake if it is not properly stabilised Finishing B 13 12 WARNING Secure enough space between the bathtub and tiles and fill that space with silicone th...

Page 17: ...17 MEMO...

Page 18: ...18 MEMO...

Page 19: ...19 MEMO...

Page 20: ...TOTO Ltd All rights reserved 2018 1 Printed in China NTE185...

Reviews: