4
ENGLISH
INSTALLATION PROCEDURE
1) Remove the deck adaptors from TB624S1 and fasten them to the TB2F rough-in.
2) Use the valve tightening tool to tighten the valve deck adaptors onto the valve bodies.
3) Connect handshower hose to the TB2F handshower outlet hose.
4) Install the TB624S1 trims.
5) Tighten the set screws for each trim.
Built Up Deck Installation
1
4
3
4
1
1
2
Hot
Cold
Hand Shower
Red (Hot)
Handshower
Blue (Cold)
5
1
4
5
3
4
4
1
1
2
Hot
Cold
Hand Shower
Red (Hot)
Handshower
Blue (Cold)
5
5
5
5
5
5