![Toto EcoPower Series Installation And Owner'S Manual Download Page 8](http://html1.mh-extra.com/html/toto/ecopower-series/ecopower-series_installation-and-owners-manual_1139627008.webp)
INSTALLATION PROCEDURE
Control stop
Snap ring
O-ring
White
Battery
White
TEU1UA
all valves except for
TEU1UA
4. Prior to inserting the Flush Valve tailpiece into
the control stop, make sure that the o-ring is in
the groove at the end of the tailpiece, the
locking nut and the snap ring are located as
shown.
5. Connect the Flush Valve with the control stop
and the vacuum breaker tube. Exercise care not
to damage the o-ring when inserting the
tailpiece into the control stop. If lubrication is
needed, wetting the o-ring with water is
sufficient.
6. Align the Flush Valve and securely tighten
fixture spud nut, vacuum breaker tube nut and
locking nut with a wrench.
7. Connect the battery cable with that of the
controller and set the battery at the proper
position.
8. Connect the cables of the solenoid
valve and generator with those of
controller.
E
N
GLIS
H
8
Green
Green
White
NOTE:
It will take 5 minutes after connecting the
battery for the electronics to initialize.
After approximately 30 seconds, the
sensor LED will flash in 4 second intervals
until the initialization completes.