PART 5
12
11
Rubber bands
The included rubber band may vary in
colour.
This is the main rubber band that
accumulates energy when pulled back,
and releases it to shoot.
This rubber band ensures that the
release arm will be in the right posis-
tion for next shot,
A
B
A
B
Loop the rubber band to the release arm as shown.
Stretch the rubber band AROUND the whole arm.
Summary of Contents for HOCKEY BOT
Page 1: ...v 1 5 ...
Page 7: ...NOTE This tap to this side OBS 2x 35mm PART 1 5 6 7 8 10cm 2x 2x ...
Page 10: ...5 6 10cm 1 4 7 10 ...
Page 11: ...PART 2 7 8 ...
Page 13: ...3 4 PART2 ...
Page 14: ...5 6 2 8 Use the Totem Wrench Socket ...
Page 17: ...PART 3 9 10 ...
Page 19: ...3 4 ...
Page 20: ...5 6 120mm 24H 65mm 13H 14 holes Note 10mm Note 12mm Smooth spin Use the Totem Wrench Socket ...
Page 25: ...3 4 4cm 8cm 10cm ...
Page 26: ...5 Use the Totem Wrench Socket ...
Page 27: ...6 Don t tighten link too much There must be a smooth rotation ...
Page 30: ...PART 6 1 2 4x Bolt M3x6 1x X3 Controller Board PART 6 Mount the X3 controller ...
Page 32: ...Note Observe the orientation Brown Red and Yellow ...
Page 33: ...PART 7 Building is finished Now it is time to test your model ...
Page 37: ......