1st Roof Section
Now place the 1st of the 3 roof panels
as shown in the diagram below.
PLACE ROOF SECTION 1 of 3
Secure roof panels by screwing them
down to kennel framework as shown.
= Drill Points using
screws provided as shown
x4
4.0 x 70mm
Using the Floor Block Posts, elevate
the right front panel and place
between the middle front panel and
right side panel as shown.
www.totalsheds.co.uk
Manual Page 8
Front Mesh Door Panel
Now place the front mesh right door panel in
between the front left and right side panels.
ATTACH RIGHT FRONT MESH DOOR
STEP • 12
STEP • 11
© Sheds (Midlands) Limited 2021 • 12x4ft Dog Kennel
= Drill Points using
screws provided as shown
x6
4.0 x 70mm
FRONT RIGHT PANEL
46”
Heigh
t
(1168.4mm)
21”
(1193.8mm)
47” Width
ROOF PANEL 1
(1193.8mm)
(1193.8mm)
47”
Heigh
t
47” Width
DRILL
DRIVER
DRILL
DRIVER