PLACE LAST ROOF SECTION
Final Roof Section
Now place the last roof panel as shown
in the diagram below.
= Drill Points using
screws provided as shown
x6
4.0 x 70mm
Manual Page 9
STEP • 14
www.totalsheds.co.uk
PLACE ROOF SECTION 2 of 3
2nd Roof Section
Now place the 2nd roof panel as shown
in the diagram below.
DRILL
DRIVER
Now secure down the roof
and the base adjusting where
need be to make final
structure safe & solid.
= Drill Points using
screws provided as shown
x5
4.0 x 70mm
© Sheds (Midlands) Limited 2021 • 12x4ft Dog Kennel
STEP • 13
ROOF PANEL 2
ROOF PANEL 2
(1193.8mm)
(1193.8mm)
47”
Heigh
t
47” Width
(1193.8mm)
(1193.8mm)
47”
Heigh
t
47” Width
Now secure down the roof
and the base adjusting where
need be to make final
structure safe & solid.
16x4ft
x1
DOG
KENNEL
x2
REPEAT
STEP:
REPEAT
STEP:
20x4ft
DOG
KENNEL
DRILL
DRIVER
Remember to drill the panels down
to the floor at this stage as all the
build sections are together now.
Now screw down the roof and
the base adjusting where
need be to make final structure
safe & solid. Also screw down the
side blocks under floating panels.