STEP • 10
STEP •11
07
© Sheds (Midlands) Limited 2021
www.totalsheds.co.uk
= Drill Points using
screws provided as shown
x2
4.0 x 70mm
Per Floor Section
x3
x3
4.0 x 70mm
Per Window Panel
4ft DOOR PANEL
DOOR PANEL
Attach Door Panel Next
to the 2ft
Window Panel
10a.
Use the RED areas below as reference to the joining points of the final panel. Note the 4ft section should
fit perfectly to continue the front section.
DID YOU KNOW?
Door panels can be placed anywhere a 4ft panel
is. The 4ft Door must be placed opposite the 4ft
back panel and on top of a 4ft floor.
10b.
This is the last remaining panel. So, this
panel will need screwing down on both sides
(As Shown). Once competed, check that the
shed is square and screw to the base.
x2
4.0 x 70mm
Per Floor Section
= Drill Points using
screws provided as shown
x3
x2
4.0 x 70mm
6ft APEX ROOF GABLE ENDS
APEX ROOF GABLE ENDS
(Set Frame for roof sections)
Now attach all the 6ft Apex
Gable Ends and the 6ft Apex
Truss
11a.
Place the the roof Gable Ends as shown below. The 2 outer
sections will be fully framed as below and any centre trusses will fit
in between all panel meeting points.
11b.
Truss must sit in
between panel sections
where two panels meet.
Ensure the Gable Ends
slot neatly in to the
current Tongue & Groove
over lower section, then
screw down using the
framework behind.
6ft GABLE END
6ft TRUSS
6ft GABLE END