Disassembly and Reassembly
Toshiba
4-9
4-3-7 Bracket Gear, Gear Joint 2, 1 Removal
1) Remove the Screw
Œ
.
2) Remove the Bracket Gear
´
.
3) Remove the Gear Joint 2
ˇ
.
4) Remove the Gear Joint 1
¨
.
Assembly
:
1) Be sure to align dot mark of Gear Joint 1
Œ
with
dot mark of Gear Joint 2
´
as shown Fig 4-15.
(Refer to Timing point1)
2) Confirm the Timing Point 2 of the Gear Joint 2
´
and Slider Cam
ˇ
.
Œ
SCREW
´
BRAKET GEAR
¨
GEAR JOINT 1
ˇ
GEAR JOINT 2
4-3-8 Gear Loading Drive, Slider Cam,
Lever Load S, T Ass’y Removal
1) Remove the Belt Pulley. (Refer to Fig. 4-33)
2) Remove the Gear Loading Drive
Œ
after releasing
Hook [A] in the direction arrow as shown in detail
drawing.
3) Remove the Slider Cam
´
.
4) Remove the Lever Load
ˇ
, Link Load
ˆ
& Lever
Load
¨
, Link Load
Ø
.
Œ
GEAR LOADING DRIVE
ˆ
LINK LOAD S
ˇ
LEVER LOAD S
¨
LEVER LOAD T
Ø
LINK LOAD T
´
SLIDE CAM
HOOK(A)
Fig. 4-14 Bracket Gear, Gear Joint 1,2 Removal
Œ
GEAR JOINT1
´
GEAR JOINT2
ˇ
SLIDER CAM
TIMING POINT 1
TIMING POINT 2
Fig. 4-15 Gear Joint 1,2 Assembly
Fig. 4-16 Gear Loading Drive, Slider Cam,
Lever T, S Load Ass’y Removal
Summary of Contents for W-412
Page 16: ...Reference Information 2 12 Toshiba 2 2 1 IC301 LA71200M 2 2 IC Blocks ...
Page 17: ...Reference Information Toshiba 2 13 2 2 2 IC601 MN101D02D ...
Page 47: ...Exploded View 6 2 Toshiba 6 1 Packing Assembly Y101 A702 A701 Y102 UT01 A702 ...
Page 58: ...Toshiba 8 1 8 Block Diagram HI FI MODEL ONLY ...
Page 59: ...Toshiba 9 1 9 PCB Diagram 9 2 9 1 Main ...
Page 60: ...PCB Diagram 9 2 Toshiba 9 1 Main ...
Page 61: ...PCB Diagram Toshiba 9 3 ...
Page 64: ...Schematic Diagrams Toshiba 10 3 10 1 S M P S Power ...
Page 65: ...Schematic Diagrams 10 4 Toshiba 10 2 Logic ...
Page 66: ...Schematic Diagrams Toshiba 10 5 10 3 A V ...
Page 67: ...Schematic Diagrams 10 6 Toshiba 10 4 TM Block Input Ouput ...
Page 68: ...Schematic Diagrams Toshiba 10 7 10 5 Display ...