Strata CTX670 Installation
3-32
Strata CTX I&M September 2002
13. Use a hack saw to cut the threaded rods at a height of approximately 3.8cm (1.5”) above the
floor tile.
14. Move the Base Cabinet into position over the threaded rods.
15. Secure the Base Cabinet to the floor using flat washers, lock washer, and hex nuts on each
threaded rod.Mount Cabinets to Computer Room Floor (Unbolted).
16. Make sure that cabinet power supplies (BPSU672A) are installed per
17. Remove front, side, and top covers from all cabinets (
Note
As shown in
, the two screws on each side cover and the three screws on the front
cover (the bottom left screw must be completely removed) should only be loosened and the
covers slid to the right for removal.
18. Remove plastic locating parts from all cabinet back covers using a Phillips screwdriver (
19. Install a floor fixture (BFIF) on each side of the bottom cabinet (
and
ing sure that the fixture is inside of the cabinet edge.
20. Secure a wall bracket (RWBF) to both floor fixtures with the screws provided. Secure the wall
brackets to the wall with customer-provided wood screws and wall anchors.
21. Place a cabinet on top of the bottom cabinet and connect the cabinets together at points “A” and
“B”17 with the screws provided.
22. Install wall brackets (RWBF) on the top of cabinet three and secure them to the wall with cus-
tomer-provided wood screws and wall anchors.
23. Add remaining cabinets, making sure that the cabinets are connected together at points A and B
with screws provided.
24. For systems with four or more cabinets, make sure that wall brackets (RWBF) are installed on
both sides of the top cabinet, in addition to cabinet three.
25. Connect the data cable of each Expansion Cabinet to the applicable data cable connector on the
Base Cabinet (
). The data cable from the first Expansion Cabinet should be con-
nected to the connector labelled “CAB. 2”, the cable from the second Expansion Cabinet to the
“CAB. 3” connector, etc.).
26. Install ground wiring, AC and reserve power cabling, and PCB cabling per the
Installation Sequence” on Page 3-6
27. Fill out cabinet/slot identification labels on each cabinet (see
), then reinstall covers
on the cabinets. (The top cover should be installed on the top cabinet.)
Summary of Contents for Strara CTX Series
Page 10: ...Contents viii Strata CTX I M September 2002 ...
Page 14: ...Introduction xii Strata CTX I M September 2002 ...
Page 52: ...Strata CTX Configuration 1 38 Strata CTX I M September 2002 ...
Page 176: ...ISDN Interfaces 5 28 Strata CTX I M September 2002 ...
Page 278: ...Peripheral Installation 8 32 Strata CTX I M September 2002 ...