3 Tests and Diagnostics
3.12 Magnetic Switch Test
The Magnetic switch test checks the Magnetic function of the unit. When LCD cover closed, the
Magnetic should enable to turn off the display.
Follow below steps to run this test:
1.
Close the LCD cover.
2.
Open the LCD.
Then it will indicate whether the test is passed or failed.
1>. If the Magnetic switch test as fail, it will show below display:
Satellite L670D/L675D/ProL67D Series Maintenance Manual
[CONFIDENTIAL]
23
Summary of Contents for Satellite L675D Pro
Page 17: ......
Page 35: ......
Page 200: ...B 4 CONFIDENTIAL SatelliteL670D L675D Pro L670D Maintenance Manual PJP2 Battery conn ...
Page 240: ...Figure LA keyboard Satellite L670D L675D ProL670D Series Maintenance Manual CONFIDENTIAL 17 ...
Page 244: ... CONFIDENTIAL SatelliteL670D L675D Pro L670D Maintenance Manual ...