2. CONSTRUCTION VIEWS
2.1 Indoor unit
RAV-133TU-PE
RAV-163TU-PE
Space required for service and installation
(Unit: mm)
550
View A
200
Ceiling opening 510
Panel outer dimension 550
Hang bolt pitch 480
410
20
40
40
Hang bolt pitch 930
Ceiling opening 1010
Panel outer dimension 1050
73
131
96
186
267
170
156
140
190
1050
840
130
480
190
Long hole
Remote controller
600
Minimum
Minimum
600
Minimum
70
70
Refrigerant piping joint
( Gas
∅ 12.7)
Wiring connection
840
110
90
66
20
40
60
290
Hanger bolt
(4- M10)
Refrigerant piping joint
( Liquid
∅ 6.4)
Drain pipe joint
(outer
∅ 25.5)
25
600
A
12.5
83.5
2-4.5 x 9L
120
-5-
Heronhill - for all your Toshiba requirements
Tel: 01823 665660
www.heronhill.co.uk
Fax: 01823 665807