Wiring procedure
• Bind securely together the communication wires and the demand connecting wires with the cord clamp to be not
affected by external forces.
• If the demand connecting wires contain DRED terminal block connections, confi rm to fi x it so that DRED
terminal block connections comes to the left side from the cord clamp.
DRED
DRM3 DRM2 DRM1 COM
DRED terminal
block connections
Cord clamp
Demand response
interface
Communication wires
Locally procured
Demand connecting wires
SHIELD
TO INDOOR UNIT
−
1
57
−
AMP Air Conditioning
www.ampair.co.uk | [email protected]
Summary of Contents for MAP1406HT8(J)P
Page 304: ...For HT8 J P E HT8 J P TR model 303 AMP Air Conditioning www ampair co uk sales ampair co uk ...
Page 311: ... 310 For HT8 J P E HT8 J P TR model AMP Air Conditioning www ampair co uk sales ampair co uk ...
Page 318: ... 317 For HT8 J P E HT8 J P TR model AMP Air Conditioning www ampair co uk sales ampair co uk ...
Page 345: ...AMP Air Conditioning www ampair co uk sales ampair co uk ...