
EN-
68
Other Settings
(continued)
HOW TO OPERATE
(continued)
C
Push [Manual Meter-Reading] to totalize the
data between the previous and current meter-
reading dates.
A confirmation message for the Would you like
to continue data reading? screen (Fig. 48-3) is
displayed.
Fig. 48-3 Would you like to continue data
reading? screen
Fig. 48-4 Next Time, Meter-Reading consists
of xx/xx ~ screen
Fig. 48-2 Meter-Reading setting screen
C
D
E
E
Push [Yes] to reset the integrated value of
operation time and proportional power sharing
and start integration after data is totalized.
Push [No] to perform integration continuously
without clearing the integrated value of operation
time and proportional power sharing after data is
totalized.
D
Push [Yes] to perform integration continuously
without clearing the integrated value of operation
time and proportional power sharing after data is
totalized.
Push [No] to display a confirmation message for
the Next Time, Meter-Reading consists of xx/xx ~
screen (Fig. 48-4).