No. 2A201-519EN*A
20
6.
CLASSIFICATION OF INSTALLATION-RELATED WORK
* The field engineers should check and clarify the scope of the work and the allocation of
responsibilities.
6.1
Scope of Work to Be Executed by the Customer
The work listed below should be executed by the customer as a general rule.
See sections 7 to 9 for details concerning the execution of the work.
(1) Construction
work
(Refer to section 7.)
A. New construction, extension, and reconstruction works of the
building
B. X-ray shielding in the scanning room
Wall
shielding
Door and frame shielding
Window and frame shielding
C. Reinforcement for floor load
D. Wiring pit and ducting
E. Interior finish work of the building
(2) Electrical
work
(Refer to section 8.)
A. Power supply system
B. Power distribution board
C. Grounding
D. "X-ray on" indication lamp during X-ray exposure, piping, and
wiring
E. Interior illumination and dimmers
F. Installation of a public telephone line jack for InnerVision
(3) Air
conditioning
and plumbing system
(Refer to section 9.)
A. Air conditioning work (heater, cooler, and ventilation)
B. Water supply and drainage work (e.g., for a washstand)
6.2
Scope of Work to Be Executed by Toshiba
(1) Bringing-in, installation, and adjustment of the entire system
(2) Intersystem wiring and cable connections to the customer's facilities
(3) Installation of the InnerVision service processor and connection to the public telephone line