![Torque X-CREATE Anchoring Requirements And Instructions Download Page 4](http://html.mh-extra.com/html/torque/x-create/x-create_anchoring-requirements-and-instructions_1134570004.webp)
ANCHORING LOCATIONS
NOTES
1. Complete assembly of entire frame and position the X-Create where desired prior to
starting the anchoring procedure. Some attachments such as the lower Accessory Trays
may interfere with the drilling operation and should be left off or removed prior to
anchoring. (See
page 7
for placement along wall.)
2. Using a level, ensure that the uprights are vertically level.
3. If the concrete floor is covered with padded carpet or rubber, it is recommended that
cutouts be made around the base plates so that the uprights can be mounted directly
to the floor. This will ensure that the system is stable and will reduce shear forces on the
anchors.
4. Each X-Create upright provides eight anchoring locations. In every upright, the front two
and rear two holes are required to have anchors installed. (If embedment depth of 2-1/2
inches is not possible or if the concrete is less than 3000 psi but greater than 2000 psi, use
anchors in all eight holes.)
4
REQUIRED
REQUIRED
OPTIONAL
(ON BOTH SIDES)
(SEE STEP 4)