6.
Install the front support bracket (with 1 hole on each
side) to the 2 front upright frame brackets with 2
carriage bolts (5/16 x 3/4 inch) and 2 flange nuts (5/16
inch) as shown in
Figure 6
1.
Carriage bolt (5/16 x 3/4
inch)
3.
Flange nut (5/16 inch)
2.
Front upright frame
bracket
4.
Front support bracket (with
1 hole on each side)
7.
Install the cross-support bracket to the front support
bracket (with 2 holes on each side) and pipe bracket
with 4 carriage bolts (5/16 x 3/4 inch) and 4 flange
nuts (5/16 inch) as shown in
Figure 7
1.
Carriage bolt (5/16 x 3/4
inch)
4.
Front support bracket (with
2 holes on each side)
2.
Pipe bracket
5.
Flange nut (5/16 inch)
3.
Cross-support bracket
8.
Install the fire-extinguisher mount to the side upright
frame bracket and front upright frame bracket with 4
carriage bolts (5/16 x 3/4 inch) and 4 flange nuts (5/16
inch) as shown in
Figure 8
1.
Side upright frame bracket
4.
Fire-extinguisher mount
2.
Carriage bolt (5/16 x 3/4
inch)
5.
Flange nut (5/16 inch)
3.
Front upright frame
bracket
4
Summary of Contents for Workman GTX Series
Page 7: ...Notes 7...
Page 8: ......