![Toro Workman GTX Series Installation Instructions Manual Download Page 3](http://html1.mh-extra.com/html/toro/workman-gtx-series/workman-gtx-series_installation-instructions-manual_1133809003.webp)
2.
Install the 3 shovel mounts to the side upright frame
brackets with 12 carriage bolts (5/16 x 3/4 inch) and
12 flange nuts (5/16 inch) as shown in
Figure 2
1.
Carriage bolt (5/16 x 3/4
inch)
3.
Flange nut (5/16 inch)
2.
Side upright frame bracket
4.
Shovel mount
3.
Loosely install the 2 front upright frame brackets to the
inside of the cargo bed with 4 hex-head screws (1/4 x
3/4 inch) as shown in
.
Figure 3
1.
Front upright frame
bracket
2.
Hex-head screw (1/4 x 3/4
inch)
4.
Install the pipe bracket to the 2 side upright frame
brackets and front upright frame bracket with 6 carriage
bolts (5/16 x 3/4 inch) and 6 flange nuts (5/16 inch) as
shown in
.
Figure 4
1.
Pipe bracket
4.
Carriage bolt (5/16 x 3/4
inch)
2.
Flange nut (5/16 inch)
5.
Front upright frame
bracket
3.
Side upright frame bracket
5.
Install the front support bracket (with 2 holes on each
side) to the top of the 2 front upright frame brackets
with 4 carriage bolts (5/16 x 3/4 inch) and 4 flange
nuts (5/16 inch) as shown in
Figure 5
1.
Carriage bolt (5/16 x 3/4
inch)
3.
Front support bracket (with
2 holes on each side)
2.
Flange nut (5/16 inch)
4.
Front upright frame
bracket
3
Summary of Contents for Workman GTX Series
Page 7: ...Notes 7...
Page 8: ......