g028544
1 2 3
2 4 5
Figure 7
1.
Flange locknut (4)
4.
Flat washer (4)
2.
ROPS plates (4)
5.
Bolt (1/2 x 3–1/2 inches)
(4)
3.
Rollbar
Installing the Rollbar
1.
Lift the rollbar with the cutouts in ends of the tube
facing up and align the holes with the rollbar supports.
Note:
A second person to perform the next step will
be helpful.
2.
Attach the rollbar to the rollbar supports as shown in
. Leave the bolts loose.
1 2
3
2 1
4
g028545
Figure 8
1.
Bolt (1/2 x 3–1/2 inches)
(4)
3.
Flange locknut (4)
2.
Flat washer (4)
4.
Rollbar
Making Final Adjustments
1.
Tighten the fasteners in the order specified in the
following table.
, and
will
help identify the parts.
Sequence
Description
Torque
1
Four bolts on each
side attaching the
pivot brackets to
the rollbar and
rollbar support.
400 ± 40 in-lbs
(45 ±.4 N-m)
2
Two bolts on each
side attaching the
rollbar support to
the frame and the
rollbar support to
the brace .
300 ± 30 in-lbs
(34 ± 3 N-m)
3
One bolt on each
side attaching
the braces to the
machine frame.
75 ± 8 ft-lbs
(102 ± 11 N-m)
4
One bolt on each
side attaching the
rollbar to the engine
guard.
60 to 80 in-lbs.
(7 to 9 N-m)
Note:
Do not exceed torque specifications. Doing so
may cause structural damage to the ROPS or the frame
of the machine.
5
Summary of Contents for TITAN ZX 74846
Page 7: ...Notes 7 ...
Page 8: ......